CLIENT | PROJECT | SCHEDULE | STATUS |
Mott MacDonald Group Ltd/EoN | Provision of Mechanical Engineering, project planning and cost control services for full owner’s engineer role from design through construction and commissioning on Stevens Croft Wood Burning Power Plant, Lockerbie, Scotland | Oct 2006 – December, 2009 | 100% completed and delivered |
Mott MacDonald Group/Rabigh Arabian Water & Electric Company (RAWEC) | Provided project management consultancy services for a plant which comprises nine off MHI HFO boilers, five off 90 MW back pressure steam turbines and 30 MIGD RO desalination plant.
|
November 2007 – June, 2010 | 100% completed |
GE Oil & Gas Ltd/Inpex | Provision of project planning, cost control and management consultancy services Inpex Ichthys LNG Australia. Worked during the tendering and Front End Engineering Design phases of the project
|
October 2010 – April 2011 | 100% completed |
Aker Solutions/Equinor
|
Provision of project planning, cost control and management consultancy services for Statoil Asgard compression project and Skuld Subsea Production project
|
April 2011 – June 2012 | 100% completed |
AMEC Upstream Oil & Gas Ltd/Bluewater | Provision of project planning and project controls services for Brynhild FPSO tie back project
|
July 2012 – July 2013 | 100% completed |
Aker Solutions/Total
|
Provision of project planning and project controls services for Kaombo Subsea production systems project involving EPCI of 59 vertical Xmas trees, 20 production manifolds, jumpers, HFLs & EFLs
|
July 2013 – October 2016 | 100% completed |
Vinci Construction | Provision of project planning and project controls services for various Fire Safety Improvement (FSI) projects for UK courts and high security prisons | November 2016 to April 2020 | 100% completed |
(1). Petrofac OP&O/ Maersk Oil (UK)
(2). Petrofac OP&O/ Apache (Northsea) Ltd. (UK).
|
Provision of lead process engineering and consultancy services for the following:
(1) Completion and modification for Maersk Oil UK’s FPSO (GPIII, JANICE & GRAPHIN) from design through to execute (construction & commissioning phases). (2). Apache’s Forties Charlie, Forties Bravo, Beryl, & Forties Delta NGL replacement Compressors project’s process engineering supports from FEED through detailed design to commissioning/handover phases. |
(1) Jan. 2013 – May 2013
(2) Jun 2013 – Feb. 2017 |
All 100% completed and delivered. |
Gramen Petroserve/ Chevron
|
Process engineering and consultancy services to GRAMEN PETROSERVE / KOHASA / CHEVRON for the Escravos Export System Project (EESP) transient analysis 30″ subsea export pipeline for Chevron Nigeria of from detailed design to commissioning/handover phases. | Mar 2017 – Nov. 2018 | 100% completed and delivered. |
(1) HOMIK Engineering Co. Ltd / BAYWOOD / Chevron Nigeria (project was executed from the UK)
(2) HOMIK Engineering / Midwestern Oil & Gas Ltd Nigeria (project was executed from the UK)
(3) HOMIK Engineering Co. Ltd / Platform Petroleum Ltd Nigeria (project was executed from the UK)
(4) HOMIK Engineering Co. Ltd / Newcross Petroleum Ltd Nigeria (project was executed from the UK)
(5) HOMIK Engineering Co. Ltd / NAOC (Nigeria project but was executed from the UK)
|
(1). Process engineering and consultancy services to HOMIK / BAYWOOD / CHEVRON for the Escravos Tank 2 Repair & Upgrade Project.
(2). Process engineering and consultancy services to HOMIK / MIDWESTERN for the Midwestern’ Oil & Gas Umusadege CPF Gaslift Facility design Project (from Conceptual Study through FEED, DED, construction, commissioning and handover phases). (3) Process engineering and consultancy services to HOMIK / PLATFORM for the Platform Petroleum Ltd’s Egbaoma – OB3 Gas Compression and Export Pipeline FEED., Detailed Design & Commissioning Support. (4). Process engineering and consultancy services to HOMIK / NEWCROSS for Newcross Petroleum Ltd’s Efe – Ogharefe Evacuation Pipeline Project.
(5) Process engineering and consultancy services to HOMIK / NAOC for the Consultant to HOMIK Engineering Ltd / NAOC for Ogbainbiri Flow Station De-Bottlenecking Study for Increased Gas Handling Capacity from 150 MMSCFD to 300 MMSCFD. |
(1) Dec. 2018 – Apr. 2019
(2) May. 2019 – Dec. 2019
(3) May. 2019 – Nov. 2019
(4) Jun. 2019 – Dec. 2019
(5) Jan. 2020 – Apr. 2020 |
All 100% completed and delivered. |
HOMIK Engineering Co. Ltd / AMNI (Nigeria project but was executed from the UK) | Process engineering and consultancy services to HOMIK / AMNI for the AMNI’s Princess Aweni FPSO Crude De-gasser and Electrostatic Coalescer /Dehydrator Replacement and other ancillary FPSO modifications. | Feb. 2020 – Till Date |